[{"data":1,"prerenderedAt":542},["ShallowReactive",2],{"api-navigation":3,"api-page-home":99,"api-news-list":344},{"id":4,"documentId":5,"address":6,"phoneNumber":7,"faxNumber":8,"email":9,"companyRegistrationNumber":10,"siteName":11,"companyName":11,"latitude":12,"longitude":13,"createdAt":14,"updatedAt":14,"publishedAt":15,"logo":16,"main_buttons":17,"footer_links":23,"social_media_links":32,"opening_hours":33,"main_navigations":50},2,"puhmlofai6shlpst59nvr87x","\u003Cp>Level 14, Tower 2, Etiqa Twins,\u003Cbr>11, Jalan Pinang,\u003Cbr>50450 Kuala Lumpur.\u003C\u002Fp>","+603-21612155","+603-21610539","enquiries.malaysia@jgc.com","200701012044 (770049-P)","JGC Malaysia","3.1543612670007084","101.71079882447637","2026-06-19T14:04:36.917Z","2026-06-19T14:04:36.943Z",null,[18],{"id":19,"url":20,"openLinkInNewTab":21,"label":22},10,"\u002Fcontact",false,"Contact",[24,28],{"id":25,"url":26,"openLinkInNewTab":21,"label":27},11,"\u002Fsitemap","Site Map",{"id":29,"url":30,"openLinkInNewTab":21,"label":31},12,"\u002Fprivacy","Privacy",[],[34,39,42,45,48],{"id":35,"dayOfWeek":36,"opens":37,"closes":38},6,"Monday","08:30","17:30",{"id":40,"dayOfWeek":41,"opens":37,"closes":38},7,"Tuesday",{"id":43,"dayOfWeek":44,"opens":37,"closes":38},8,"Wednesday",{"id":46,"dayOfWeek":47,"opens":37,"closes":38},9,"Thursday",{"id":19,"dayOfWeek":49,"opens":37,"closes":38},"Friday",[51,55,69,73,77,82,87,92,95],{"id":19,"label":52,"url":53,"open_link_in_new_tab":21,"items":54},"Home","\u002F",[],{"id":56,"label":57,"url":58,"open_link_in_new_tab":21,"items":59},18,"About Us","",[60,63,66],{"id":40,"url":61,"openLinkInNewTab":21,"label":62},"\u002Fcompany-profile","Company Profile",{"id":43,"url":64,"openLinkInNewTab":21,"label":65},"\u002Fcorporate-philosophy-jgc-group","Corporate Philosopy",{"id":46,"url":67,"openLinkInNewTab":21,"label":68},"\u002Fprinciples-business-conduct-jgc-group","Principles of Business Conduct",{"id":25,"label":70,"url":71,"open_link_in_new_tab":21,"items":72},"Our Business","\u002Four-business",[],{"id":29,"label":74,"url":75,"open_link_in_new_tab":21,"items":76},"News","\u002Fnews",[],{"id":78,"label":79,"url":80,"open_link_in_new_tab":21,"items":81},13,"Oversea Network","\u002Foversea-network",[],{"id":83,"label":84,"url":85,"open_link_in_new_tab":21,"items":86},14,"CSR","\u002Fcsr-jgc-group",[],{"id":88,"label":89,"url":90,"open_link_in_new_tab":21,"items":91},15,"Careers","\u002Fcareers-jgc-malaysia",[],{"id":93,"label":22,"url":20,"open_link_in_new_tab":21,"items":94},16,[],{"id":96,"label":97,"url":26,"open_link_in_new_tab":21,"items":98},17,"Sitemap",[],{"id":40,"documentId":100,"title":52,"slug":101,"createdAt":102,"updatedAt":102,"publishedAt":16,"locale":16,"seo_settings":103,"banner":16,"sections":106},"tc9iqspl0v0thncac4uyhgcg","home","2026-06-19T10:57:17.227Z",{"id":104,"metaTitle":52,"metaDescription":105,"metaKeywords":16,"structuredData":16},41,"JGC Malaysia specializes in EPCC services for the oil and gas industry. A trusted subsidiary of JGC Corporation, providing engineering, procurement, construction, and commissioning solutions.",[107,243,340],{"id":108,"items":109,"__component":242},1,[110,163,202],{"id":108,"title":16,"description":16,"buttons":111,"image":112,"video":16},[],{"id":113,"documentId":114,"name":115,"alternativeText":16,"caption":16,"focalPoint":16,"width":116,"height":117,"formats":118,"hash":157,"ext":122,"mime":123,"size":158,"url":159,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":162,"updatedAt":162,"publishedAt":162,"locale":16},90,"ij6gm0krt8po2j1bkp0s0viv","banner1.jpg",1420,482,{"thumbnail":119,"medium":130,"small":139,"large":148},{"name":120,"hash":121,"ext":122,"mime":123,"path":16,"width":124,"height":125,"size":126,"sizeInBytes":127,"url":128,"etag":129},"thumbnail_banner1.jpg","thumbnail_banner1_62bd3267a6",".jpg","image\u002Fjpeg",245,83,7.28,7284,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_banner1_62bd3267a6.jpg","53870e56c0a2a9ff61d39593ed8ef1e1",{"name":131,"hash":132,"ext":122,"mime":123,"path":16,"width":133,"height":134,"size":135,"sizeInBytes":136,"url":137,"etag":138},"medium_banner1.jpg","medium_banner1_62bd3267a6",750,255,64.47,64473,"https:\u002F\u002Fjgc.assetz.my\u002Fmedium_banner1_62bd3267a6.jpg","7d2ab41b26ca4ac5168424e541d94d67",{"name":140,"hash":141,"ext":122,"mime":123,"path":16,"width":142,"height":143,"size":144,"sizeInBytes":145,"url":146,"etag":147},"small_banner1.jpg","small_banner1_62bd3267a6",500,170,29.19,29186,"https:\u002F\u002Fjgc.assetz.my\u002Fsmall_banner1_62bd3267a6.jpg","35f40ba4da48f885f1614ac5e0868f06",{"name":149,"hash":150,"ext":122,"mime":123,"path":16,"width":151,"height":152,"size":153,"sizeInBytes":154,"url":155,"etag":156},"large_banner1.jpg","large_banner1_62bd3267a6",1000,339,113.87,113871,"https:\u002F\u002Fjgc.assetz.my\u002Flarge_banner1_62bd3267a6.jpg","6d5fb03c992cb9a166ee02cf5568b04c","banner1_62bd3267a6",220.3,"https:\u002F\u002Fjgc.assetz.my\u002Fbanner1_62bd3267a6.jpg","@strapi\u002Fprovider-upload-aws-s3","\u002F4","2026-06-19T09:53:03.355Z",{"id":4,"title":16,"description":16,"buttons":164,"image":165,"video":16},[],{"id":166,"documentId":167,"name":168,"alternativeText":16,"caption":16,"focalPoint":16,"width":116,"height":117,"formats":169,"hash":198,"ext":122,"mime":123,"size":199,"url":200,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":201,"updatedAt":201,"publishedAt":201,"locale":16},86,"kk7ohronqbnseevfhjtjemha","banner2.jpg",{"thumbnail":170,"small":177,"medium":184,"large":191},{"name":171,"hash":172,"ext":122,"mime":123,"path":16,"width":124,"height":125,"size":173,"sizeInBytes":174,"url":175,"etag":176},"thumbnail_banner2.jpg","thumbnail_banner2_c8f5ad01ed",4.27,4272,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_banner2_c8f5ad01ed.jpg","e47d34ccf877d743cdd4460e015e062b",{"name":178,"hash":179,"ext":122,"mime":123,"path":16,"width":142,"height":143,"size":180,"sizeInBytes":181,"url":182,"etag":183},"small_banner2.jpg","small_banner2_c8f5ad01ed",13.91,13909,"https:\u002F\u002Fjgc.assetz.my\u002Fsmall_banner2_c8f5ad01ed.jpg","e891fc2eafef2c804bb19db1729a0a89",{"name":185,"hash":186,"ext":122,"mime":123,"path":16,"width":133,"height":134,"size":187,"sizeInBytes":188,"url":189,"etag":190},"medium_banner2.jpg","medium_banner2_c8f5ad01ed",25.67,25674,"https:\u002F\u002Fjgc.assetz.my\u002Fmedium_banner2_c8f5ad01ed.jpg","ae95ec8cb4367616f9ca82ff813e296f",{"name":192,"hash":193,"ext":122,"mime":123,"path":16,"width":151,"height":152,"size":194,"sizeInBytes":195,"url":196,"etag":197},"large_banner2.jpg","large_banner2_c8f5ad01ed",41.55,41548,"https:\u002F\u002Fjgc.assetz.my\u002Flarge_banner2_c8f5ad01ed.jpg","4ae33a8937e9711f1c1a44c4115a88a0","banner2_c8f5ad01ed",71.83,"https:\u002F\u002Fjgc.assetz.my\u002Fbanner2_c8f5ad01ed.jpg","2026-06-19T09:53:03.214Z",{"id":203,"title":16,"description":16,"buttons":204,"image":205,"video":16},3,[],{"id":206,"documentId":207,"name":208,"alternativeText":16,"caption":16,"focalPoint":16,"width":116,"height":117,"formats":209,"hash":238,"ext":122,"mime":123,"size":239,"url":240,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":241,"updatedAt":241,"publishedAt":241,"locale":16},88,"yythhqabza1cw6o44ivb33ug","banner3.jpg",{"thumbnail":210,"large":217,"medium":224,"small":231},{"name":211,"hash":212,"ext":122,"mime":123,"path":16,"width":124,"height":125,"size":213,"sizeInBytes":214,"url":215,"etag":216},"thumbnail_banner3.jpg","thumbnail_banner3_f0d1a3b41c",5.83,5833,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_banner3_f0d1a3b41c.jpg","9c6cbbf93b63237e924f193d5cd4d521",{"name":218,"hash":219,"ext":122,"mime":123,"path":16,"width":151,"height":152,"size":220,"sizeInBytes":221,"url":222,"etag":223},"large_banner3.jpg","large_banner3_f0d1a3b41c",79.5,79495,"https:\u002F\u002Fjgc.assetz.my\u002Flarge_banner3_f0d1a3b41c.jpg","f4deee13302ee5a83a1e97b487fa0d6a",{"name":225,"hash":226,"ext":122,"mime":123,"path":16,"width":133,"height":134,"size":227,"sizeInBytes":228,"url":229,"etag":230},"medium_banner3.jpg","medium_banner3_f0d1a3b41c",45.7,45698,"https:\u002F\u002Fjgc.assetz.my\u002Fmedium_banner3_f0d1a3b41c.jpg","8065772a691120a62371627347e2aeb9",{"name":232,"hash":233,"ext":122,"mime":123,"path":16,"width":142,"height":143,"size":234,"sizeInBytes":235,"url":236,"etag":237},"small_banner3.jpg","small_banner3_f0d1a3b41c",21.68,21684,"https:\u002F\u002Fjgc.assetz.my\u002Fsmall_banner3_f0d1a3b41c.jpg","858ae7ec375305b315bef1bca42177de","banner3_f0d1a3b41c",150.26,"https:\u002F\u002Fjgc.assetz.my\u002Fbanner3_f0d1a3b41c.jpg","2026-06-19T09:53:03.251Z","section.hero-slideshow",{"id":108,"title":244,"description":245,"items":246,"__component":339},"Welcome to JGC Malaysia","JGC Corporation was founded on 25 October 1928, with an office at Uchisaiwai-cho, Koji-machi, in Tokyo.",[247,273,295,316],{"id":108,"title":248,"description":249,"url":61,"target":250,"variant":16,"image":251},"Who We Are?","JGC Malaysia Sdn. Bhd. is an EPCC company specialized in providing package services","_self",{"id":252,"documentId":253,"name":254,"alternativeText":255,"caption":16,"focalPoint":16,"width":256,"height":257,"formats":258,"hash":268,"ext":122,"mime":123,"size":269,"url":270,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":271,"updatedAt":272,"publishedAt":271,"locale":16},85,"be5yxy4jvkj4o56swj5a4try","fb01.jpg","JGC Malaysia engineers reviewing documents at an industrial site",214,325,{"thumbnail":259},{"name":260,"hash":261,"ext":122,"mime":123,"path":16,"width":262,"height":263,"size":264,"sizeInBytes":265,"url":266,"etag":267},"thumbnail_fb01.jpg","thumbnail_fb01_aebc5bed28",103,156,4.29,4293,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_fb01_aebc5bed28.jpg","664a6a8d4e34afec5f97d9fc0a199fdf","fb01_aebc5bed28",13.85,"https:\u002F\u002Fjgc.assetz.my\u002Ffb01_aebc5bed28.jpg","2026-06-19T09:53:03.190Z","2026-06-19T10:54:50.270Z",{"id":4,"title":274,"description":275,"url":71,"target":250,"variant":16,"image":276},"What We Do?","JGC Malaysia provides a package service of engineering, procurement, construction and commissioning (EPCC)",{"id":277,"documentId":278,"name":279,"alternativeText":280,"caption":16,"focalPoint":16,"width":281,"height":152,"formats":282,"hash":290,"ext":122,"mime":123,"size":291,"url":292,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":293,"updatedAt":294,"publishedAt":293,"locale":16},89,"aqr5hms300c3un12swcg78ls","fb002.jpg","Aerial view of an industrial engineering plant",223,{"thumbnail":283},{"name":284,"hash":285,"ext":122,"mime":123,"path":16,"width":262,"height":263,"size":286,"sizeInBytes":287,"url":288,"etag":289},"thumbnail_fb002.jpg","thumbnail_fb002_fc644b009f",5.48,5483,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_fb002_fc644b009f.jpg","40a57be3dfe1c80a058dbef94f2a2e6a","fb002_fc644b009f",24.6,"https:\u002F\u002Fjgc.assetz.my\u002Ffb002_fc644b009f.jpg","2026-06-19T09:53:03.296Z","2026-06-19T10:55:27.287Z",{"id":203,"title":296,"description":297,"url":85,"target":250,"variant":16,"image":298},"Why Choose Us?","JGC Malaysia is committed to uphold the Group's environmental conservation initiatives, corporate social responsibility (CSR) activities, and health, safety and environment (HSE) measures.",{"id":299,"documentId":300,"name":301,"alternativeText":302,"caption":16,"focalPoint":16,"width":281,"height":152,"formats":303,"hash":311,"ext":122,"mime":123,"size":312,"url":313,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":314,"updatedAt":315,"publishedAt":314,"locale":16},91,"v776jz8wtzvmvxd5dinupffj","fb006.jpg","Business handshake",{"thumbnail":304},{"name":305,"hash":306,"ext":122,"mime":123,"path":16,"width":262,"height":263,"size":307,"sizeInBytes":308,"url":309,"etag":310},"thumbnail_fb006.jpg","thumbnail_fb006_5f321848f2",3.5,3498,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_fb006_5f321848f2.jpg","d0885561d09fcd233ca7728cbeb97f45","fb006_5f321848f2",10.29,"https:\u002F\u002Fjgc.assetz.my\u002Ffb006_5f321848f2.jpg","2026-06-19T09:53:04.232Z","2026-06-19T10:56:08.946Z",{"id":317,"title":318,"description":319,"url":90,"target":250,"variant":320,"image":321},4,"Careers at JGC Malaysia","In understanding manpower the prime priority of any enterprise, JGC Malaysia always gears itself towards human resource as its core value","red",{"id":322,"documentId":323,"name":324,"alternativeText":325,"caption":16,"focalPoint":16,"width":256,"height":257,"formats":326,"hash":334,"ext":122,"mime":123,"size":335,"url":336,"previewUrl":16,"provider":160,"provider_metadata":16,"folderPath":161,"createdAt":337,"updatedAt":338,"publishedAt":337,"locale":16},87,"mobnqu6df3fwd4q8dsdz8uet","fb005.jpg","JGC Malaysia professional team",{"thumbnail":327},{"name":328,"hash":329,"ext":122,"mime":123,"path":16,"width":262,"height":263,"size":330,"sizeInBytes":331,"url":332,"etag":333},"thumbnail_fb005.jpg","thumbnail_fb005_b4f49ddeac",3.99,3986,"https:\u002F\u002Fjgc.assetz.my\u002Fthumbnail_fb005_b4f49ddeac.jpg","d486d2950a56141e82f19fdd7d0b9a58","fb005_b4f49ddeac",11.06,"https:\u002F\u002Fjgc.assetz.my\u002Ffb005_b4f49ddeac.jpg","2026-06-19T09:53:03.216Z","2026-06-19T10:56:40.487Z","section.overview",{"id":108,"title":341,"moreUrl":75,"moreLabel":342,"limit":46,"__component":343},"Latest News","+more","section.latest-news",[345,357,370,382,394,405,417,428,439,451,462,474,485,497,508,520,531],{"id":35,"documentId":346,"title":347,"date":348,"description":349,"content":350,"externalLink":351,"slug":352,"createdAt":353,"updatedAt":353,"publishedAt":354,"image":16,"seo_settings":355},"ktpgfolbibqafjpz0v94s6wo","JGC Awarded Contract for First Nearshore Floating LNG Plant in Malaysia","2023-01-10","JGC Holdings Corporation (Representative Director, Chairman and CEO Masayuki Sato) announced today that J","\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">\u003Cspan style=\"font-size:12px;\">JGC Holdings Corporation (Representative Director, Chairman and CEO Masayuki Sato) announced today that JGC Corporation (Representative Director and President Farhan Mujib), which operates the overseas Engineering, Procurement and Construction (EPC) business of the JGC Group, and as the leader of a consortium with Samsung Heavy Industries (SHI), has been awarded the Engineering, Procurement, Construction, Commissioning (EPCC) contract for a nearshore Floating Liquefied Natural Gas (FLNG) facility project in Malaysia planned by Petroliam Nasional Berhad (PETRONAS), the Malaysian oil and gas company.\u003C\u002Fspan>\u003Cbr>\u003Cspan style=\"font-size:12px;\">This facility will be the first nearshore FLNG in the world as well as the third floating LNG plant to be constructed for offshore gas fields in Malaysia, with a minimum production capacity of 2 million tonnes of LNG per annum and scheduled for completion in 2027. JGC's main responsibilities will cover the engineering, procurement and commissioning work for the FLNG topside, the associated onshore facilities, as well as the management of the overall project. As for the consortium partner, SHI will be responsible for the FLNG hull EPC work and the modular fabrication of the topside.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">&nbsp;\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">\u003Cspan style=\"font-size:12px;\">Since the 1980's, the JGC Group has executed EPC projects for PETRONAS for all nine trains of the LNG plants at the PETRONAS LNG Complex in Bintulu, Sarawak, which has an annual production capacity of approximately 29 million tons per annum, and in 2021 the successful completion of PETRONAS' second FLNG facility, PFLNG Dua, the world's first deep-water FLNG facility currently in production.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">&nbsp;\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">\u003Cspan style=\"font-size:12px;\">As a leading global contractor for LNG and Floating LNG projects, the JGC Group also achieved the Mozambique Coral FLNG 1st Cargo in November of this year. The Group's experience includes two other newly-built EPC FLNG projects out of the total of three in operation around the world, and&nbsp;is currently performing the FEED for an FLNG project in Nigeria.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">&nbsp;\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">\u003Cspan style=\"font-size:12px;\">JGC Holdings Corporation Representative Director, President and COO Tadashi Ishizuka said, \"We believe that our consortium secured the order for the PETRONAS FLNG facility project on the basis of JGC's world-leading project management capabilities and the company's advanced and proven technologies in LNG plants, accounting for about 30% of LNG plants worldwide, as well as SHI's world-class shipbuilding capabilities in this field. JGC's strong leadership backed by excellent project management know-how has been demonstrated during the Front End Engineering Design (FEED) stage.\"\u003C\u002Fspan>\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">&nbsp;\u003C\u002Fp>\u003Cp style=\"background-attachment:initial;background-clip:initial;background-image:initial;background-origin:initial;background-position:initial;background-repeat:initial;background-size:initial;border:0px;box-sizing:border-box;color:rgb(51, 51, 51);font-family:メイリオ, Meiryo, &quot;ヒラギノ角ゴ Pro W3&quot;, &quot;Hiragino Kaku Gothic Pro&quot;, &quot;Myriad Pro&quot;, Myriad, Arial, sans-serif;font-size:16px;margin:0px;outline:0px;padding:0px;vertical-align:baseline;\">\u003Cspan style=\"font-size:12px;\">Ishizuka went on to say, \"It is our sincere wish to continue to contribute to the realization of planned FLNG plants and LNG plants, with LNG positioned as a key energy transition source. In doing so, JGC will leverage its accumulated experience and achievements, founded on an abundance of high-level execution and technical capabilities.\"\u003C\u002Fspan>\u003C\u002Fp>\u003Cdiv>&nbsp;\u003C\u002Fdiv>","https:\u002F\u002Fwww.jgc.com\u002Fen\u002Fnews\u002F2023\u002F20230106.html","jgc-awarded-contract-first-nearshore-floating-lng-plant-malaysia","2026-06-19T09:31:26.452Z","2026-06-19T09:31:26.460Z",{"id":35,"metaTitle":356,"metaDescription":349,"metaKeywords":16,"structuredData":16},"JGC Awarded Contract for First Nearshore Floating LNG Plant in Malaysia | JGC Malaysia",{"id":358,"documentId":359,"title":360,"date":361,"description":362,"content":363,"externalLink":364,"slug":365,"createdAt":366,"updatedAt":366,"publishedAt":367,"image":16,"seo_settings":368},32,"itfobfzu8jjw2ydwwwfrnu09","PFLNG2 Project - Malaysia","2020-01-20","JGC's Contract for a Floating LNG Plant, the First for a Japanese CompanyAmong the gas fields distributed all over the world, many of them are small-to-medium size reserves, and mostly in the ocean. For the increase in energy demand mainly in emerging countries, development plans for small-to-medium scale offshore gas fields, which have not been developed or commercialized in the past from the viewpoint of economic efficiency, are now planning to progress by state-owned and major oil companies.","\u003Ch3>JGC's Contract for a Floating LNG Plant, the First for a Japanese Company\u003C\u002Fh3>\u003Cp>Among the gas fields distributed all over the world, many of them are small-to-medium size reserves, and mostly in the ocean. For the increase in energy demand mainly in emerging countries, development plans for small-to-medium scale offshore gas fields, which have not been developed or commercialized in the past from the viewpoint of economic efficiency, are now planning to progress by state-owned and major oil companies.\u003C\u002Fp>\u003Cp>PETRONAS, the Malaysian state-owned oil company, was planning a project to construct the third floating LNG in the world to develop offshore gas fields in the state of Sabah.\u003C\u002Fp>\u003Cp>JGC intended its positioning as a leading contractor for LNG projects, offshore as well as onshore, and formed a consortium with Samsung Heavy Industries Co. Ltd., South Korea's representative general heavy industries company, and raised their capabilities of floating LNG EPCIC to PETRONAS jointly. PETRONAS comprehensively evaluated JGC's extensive experiences in onshore LNG EPC projects and Samsung Heavy Industries' advanced shipbuilding technology, and in February 2014, JGC succeeded in being awarded the contract for a floating LNG EPCIC project, the first for a Japanese company.\u003C\u002Fp>\u003Cp>\u003Cimg src=\"https:\u002F\u002Fjgc.assetz.my\u002F002_im01_56a7c013b9.jpg\" alt=\"\" width=\"100%\">\u003C\u002Fp>\u003Ch3>Opening the way to the Oceans\u003C\u002Fh3>\u003Cp>This project is a pioneering one in the offshore oil and gas industry for constructing the world's first floating LNG to develop the deep water gas fields of 1,000 meters depth, and also has an extremely high degree of difficulty from technical standpoints.\u003C\u002Fp>\u003Cp>\"We repeated the trial-and-error process in the floating LNG engineering approximately 10 times that of onshore one even just for the piping design, as there were challenges to require new technical solutions beyond the onshore LNG engineering know-how and Lessons Learned,\" says a JGC engineer working on this project. To progress the module construction as per the EPCIC schedule, it was necessary to transfer technical information required for the construction such as design drawing, engineering data timely to Samsung Heavy Industries, which was in charge of the construction, so speed and quality of the floating LNG engineering were truly needed.\u003C\u002Fp>\u003Cp>JGC reviewed the design flow from scratch and developed a new design approach of the floating LNG, \"Plant Layout Oriented Engineering\", having the concept of one-team composing of multi discipline engineers, of which the key concept is to share all discipline information concerning the plant layout with timely manner. The information includes not only final discipline design\u002Fengineering results but also each discipline work status and\u002For potential change of the design. The approach has worked effectively and resulted in the optimization of the design\u002Fengineering sequence and in the engineering completion of about half a year faster than onshore LNG EPC projects.\u003C\u002Fp>\u003Cp>\u003Cimg src=\"https:\u002F\u002Fjgc.assetz.my\u002F002_im02_d3b6f61b9c.jpg\" alt=\"\" width=\"100%\">\u003C\u002Fp>\u003Ch3>Leading Floating LNG EPC Projects\u003C\u002Fh3>\u003Cp>In June 2017, JGC was also awarded an EPCIC contract for ENI Coral FLNG project in Mozambique, the first FLNG project in the Africa region. JGC is executing two out of the five floating LNG EPCIC projects currently available in the world which are ongoing or already started the operation. While there may be further challenges in floating LNG from now, JGC will overcome them as a leading company of the EPCIC projects.\u003C\u002Fp>\u003Cp>\u003Cimg src=\"https:\u002F\u002Fjgc.assetz.my\u002F002_im06_fa9398378d.jpg\" alt=\"\" width=\"100%\">\u003C\u002Fp>\u003Ch3>No carry over work to Offshore!\u003C\u002Fh3>\u003Cp>The construction work is making progress on schedule toward the completion in 2020.\u003Cbr>All the topside modules are installed on the hull, now the project team set out the target \"No carry over work to Offshore\".\u003Cbr>The key success factor of on-time delivery of the floating LNG is NOT to carry the planned onshore work over to offshore.\u003Cbr>Some statics says offshore work efficiency drops down to less than 25 % of its' on-ground, so to eliminate unplanned offshore work, JGC is taking initiative and making move with \"3-ON\" approach from the beginning of the project phase.\u003C\u002Fp>\u003Cul>\u003Cli>ON-Time delivery of DWG\u002FEquipment - to ensure the construction of the topside module as planned\u003C\u002Fli>\u003Cli>ON-Ground construction maximum - finish inspection and tests on land at the end of construction stage of the topside module\u003C\u002Fli>\u003Cli>ON-Shore mechanical completion and commissioning maximum - plan and finish all the commissioning work can be done on shore before sail away\u003C\u002Fli>\u003C\u002Ful>\u003Cp>The concept is, to maximize On-shore work as much as possible.\u003C\u002Fp>","https:\u002F\u002Fwww.jgc.com\u002Fen\u002Fprojects\u002Fproject-story\u002F002.html","pflng2-project-malaysia","2026-06-19T09:31:26.686Z","2026-06-19T09:31:26.694Z",{"id":358,"metaTitle":369,"metaDescription":362,"metaKeywords":16,"structuredData":16},"PFLNG2 Project - Malaysia | JGC Malaysia",{"id":371,"documentId":372,"title":373,"date":374,"description":375,"content":376,"externalLink":16,"slug":377,"createdAt":378,"updatedAt":378,"publishedAt":379,"image":16,"seo_settings":380},34,"sdceh3gb9a03jtlhedc35tep","Tank 7, Piping and Associated Facilities (T7-PAF) Project – RFSU Achieved","2017-11-28","JGC Malaysia successfully achieved the Ready for Start-Up (”RFSU”) state for the Tank 7, Piping and Associated Facilities Project (“the Project”) on 12 October 2017, at PETRONAS LNG Complex (“PLC”) in Bintulu, Sarawak, Malaysia. JGC Malaysia constructed the new seventh LNG storage tank, which has the largest LNG storage capacity in PLC. JGC Malaysia delivered the Project ahead of time with the initial stage of the start-up activities led by the client, which took place on 13 October 2017.","\u003Cp>JGC Malaysia successfully achieved the Ready for Start-Up (”RFSU”) state for the Tank 7, Piping and Associated Facilities Project (“the Project”) on 12 October 2017, at PETRONAS LNG Complex (“PLC”) in Bintulu, Sarawak, Malaysia. JGC Malaysia constructed the new seventh LNG storage tank, which has the largest LNG storage capacity in PLC. JGC Malaysia delivered the Project ahead of time with the initial stage of the start-up activities led by the client, which took place on 13 October 2017.\u003C\u002Fp>\u003Cp>The Project includes the tie-in work to the existing facilities, where dispersed widely in the live-operating LNG complex, JGC Malaysia and its reputable team have been taking the utmost prudent effort to provide reasonable protection provisions of the existing facilities, arrangements for tie-in works, and emulating a safe working culture within the work force. With these efforts together with the client’s assistance, the Project has been completed without any interruption to the operations of PLC with a remarkable safety record.\u003C\u002Fp>\u003Cp>JGC Malaysia hopes that the successful completion of the Project provides flexibility in the operation of the PLC as intended, hence will contribute to our client’s positive business developments. JGC Malaysia will continue to firmly develop its business activities in the field of improvement and renovation projects in live operating plants.\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cstrong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;(JGC Malaysia Staff of Bintulu Operation Centre, in front of No.7 LNG Tank)\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:600px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fnew_pic_cd7afea913.png\" alt=\"\" width=\"940\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>","tank-7-piping-and-associated-facilities-t7-paf-project-rfsu-achieved","2026-06-19T09:31:26.707Z","2026-06-19T09:31:26.713Z",{"id":371,"metaTitle":381,"metaDescription":375,"metaKeywords":16,"structuredData":16},"Tank 7, Piping and Associated Facilities (T7-PAF) Project – RFSU Achieved | JGC Malaysia",{"id":383,"documentId":384,"title":385,"date":386,"description":387,"content":388,"externalLink":16,"slug":389,"createdAt":390,"updatedAt":390,"publishedAt":391,"image":16,"seo_settings":392},24,"kvtind4c062yvvt25wyu3kom","JGC Safety Day 2017 for PLNG Train 9, Tank 7 NJ-PAF & MDR Projects in Bintulu and Kuala Lumpur ","2017-07-27","The Petronas LNG Train 9 (PLNG T9) Project, Tank 7 and New Jetty – Piping and Associated Facilities (Tank 7 NJ-PAF) Project and the MLNG Dua Rejuvenation (MDR) Project jointly celebrated the Annual JGC Safety Day 2017 on 5 July 2017.The HSSE Committee Chairman of JGC Corporation, Mr Kenichi Yamazaki, was in Bintulu to join and to officiate the annual event.","\u003Cp>The Petronas LNG Train 9 (PLNG T9) Project, Tank 7 and New Jetty – Piping and Associated Facilities (Tank 7 NJ-PAF) Project and the MLNG Dua Rejuvenation (MDR) Project jointly celebrated the Annual JGC Safety Day 2017 on 5 July 2017.\u003C\u002Fp>\u003Cp>The HSSE Committee Chairman of JGC Corporation, Mr Kenichi Yamazaki, was in Bintulu to join and to officiate the annual event.\u003C\u002Fp>\u003Cp>The day started at 7.00 am with JGC Management and Supervisory personnel greeting the workers before participating in the “Radio-Taiso” group physical exercise. Management personnel from the Owner also participated in the event. Mr Moon Yun Sik, Site Manager of T7 NJ-PAF made the opening speech on the Safety Day Mass Tool Box and followed by Mr Yamazaki’s speech to the assembled workers.\u003C\u002Fp>\u003Cp>The activity continued with the prize and award presentation to the winners of Safety Day Poster Competition, Job Safety Observation (JSO) and Best Workers Awards.\u003C\u002Fp>\u003Cp>Mr Yamazaki also delivered a Safety Day message from JGC President and Representative Director, Chief Operating Officer (COO), Mr Tadashi Ishizuka. He then further explained that JGC decided to go \u003Cstrong>“Back to the\u003C\u002Fstrong> \u003Cstrong>Basics”\u003C\u002Fstrong>, a fundamental concept in the field of safety and health in the execution of construction work which can be translated as to “create safe, secure and healthy workplaces in which all staff can carry out their functions with confidence”.\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cstrong>JGC Safety Day 2017 in Bintulu, Sarawak on 5 July 2017\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:435px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdsc_0601_jpeg_2_7e6a5ce78f.jpg\" alt=\"\" width=\"920\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic2_rev_6c3f7a7ef8.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic3_rev_60e1d113ae.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic4_rev_d91f0aa56c.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic5_rev_8fb36b99d5.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic6_rev_de8e2277bf.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fboc_sd_2017_pic7_rev_85f15c2333.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cstrong>JGC Safety Day 2017 in Kuala Lumpur on 6 July 2017\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cstrong>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic1_rev_b20c4a804d.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic2_rev_a5a3ea0282.jpg\" alt=\"\" width=\"450\">\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cstrong>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic3_rev_447524e845.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic4_rev_9848658735.jpg\" alt=\"\" width=\"450\">\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cstrong>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic5_rev_28c47232d1.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fkloc_sd_2017_pic6_rev_e599995370.jpg\" alt=\"\" width=\"450\">\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>","jgc-safety-day-2017-plng-train-9-tank-7-nj-paf-mdr-projects-bintulu-and-kuala-lumpur","2026-06-19T09:31:26.621Z","2026-06-19T09:31:26.626Z",{"id":383,"metaTitle":393,"metaDescription":387,"metaKeywords":16,"structuredData":16},"JGC Safety Day 2017 for PLNG Train 9, Tank 7 NJ-PAF & MDR Projects in Bintulu and Kuala Lumpur | JGC Malaysia",{"id":317,"documentId":395,"title":396,"date":397,"description":398,"content":399,"externalLink":16,"slug":400,"createdAt":401,"updatedAt":401,"publishedAt":402,"image":16,"seo_settings":403},"mux60e2s0vwchcb3agooztsn","Company sets new safety record with LNG project","2017-07-04","    ","\u003Cp>\u003Cimg style=\"height:637px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fborneo_post_dd_4july2017_headlines_with_photo_revised_f1b5ed2a4e.png\" alt=\"\" width=\"844\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:457px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fborneo_article_page_1_44b24584d6.png\" alt=\"\" width=\"834\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:339px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fborneo_article_page_2_80efee2ae2.png\" alt=\"\" width=\"837\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>","company-sets-new-safety-record-lng-project","2026-06-19T09:31:26.432Z","2026-06-19T09:31:26.438Z",{"id":317,"metaTitle":404,"metaDescription":398,"metaKeywords":16,"structuredData":16},"Company sets new safety record with LNG project | JGC Malaysia",{"id":406,"documentId":407,"title":408,"date":409,"description":410,"content":411,"externalLink":16,"slug":412,"createdAt":413,"updatedAt":413,"publishedAt":414,"image":16,"seo_settings":415},22,"vmfx9qpo5dqlstc6upbripg0","JGC Safety Day 2016 for Tank 7 NJ-PAF & MDR Projects in Bintulu and Kuala Lumpur","2016-06-06","The Tank 7 and New Jetty – Piping and Associated Facilities (Tank 7 NJ-PAF) Project and the MLNG Dua Rejuvenation (MDR) Project jointly celebrated the Annual JGC Safety Day 2016 on 27 May 2016.The chairman of JGC corporate HSSE committee based in YOKOHAMA, Mr. Kenichi Yamazaki was in Bintulu to join the project teams and the sub-contractors personnel during the occasion.","\u003Cp>The Tank 7 and New Jetty – Piping and Associated Facilities (Tank&nbsp;7 NJ-PAF) Project and the MLNG Dua Rejuvenation (MDR) Project jointly celebrated the Annual JGC Safety Day 2016 on 27 May 2016.\u003C\u002Fp>\u003Cp>The chairman of JGC corporate HSSE committee based in YOKOHAMA, Mr. Kenichi Yamazaki was in Bintulu to join the project teams and the sub-contractors personnel during the occasion.\u003C\u002Fp>\u003Cp>The day started with the JGC Malaysia management and supervisory personnel greeting the workers at the Laydown cum resting shed from 07:00 hours after which all the people participated in a group Radio Taiso physical exercise.\u003C\u002Fp>\u003Cp>Management personnel from the OWNER also participated in the program. OWNER Head of Construction and MLNG HSE Senior Manager and JGC Site Manager for Tank&nbsp;7 NJ-PAF project delivered inspiring speeches to motivate the assembled workers.\u003C\u002Fp>\u003Cp>After the management speeches, deserving workers were presented awards for best safety poster contribution and for best performing workers for the month.\u003C\u002Fp>\u003Cp>Mr. Kenichi Yamazaki participated in a walkabout to the Tank&nbsp;7 NJ-PAF work sites and the MDR work sites before the closing meeting in the MDR project office.\u003C\u002Fp>\u003Cp>During the closing meeting, Mr Kenichi Yamazaki gave direction that JGC Malaysia must consistently continue to demonstrate personal commitment towards outstanding safety performance throughout the remaining duration of the projects to ensure safety will not be compromised.\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">\u003Cimg style=\"float:left;height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_t7_pic1_0_10fc197204.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">&nbsp; &nbsp; &nbsp;&nbsp;\u003C\u002Fspan>\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_pic2_0_8b31c3605d.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fpic6_safety_day_2016_0_1d276b0c13.jpg\" alt=\"\" width=\"450\">\u003Cspan style=\"line-height:1.6em;\"> &nbsp; &nbsp; &nbsp;\u003C\u002Fspan>\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_pic7_0_d7740eef8b.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"background-color:rgb(255, 255, 255);color:rgb(51, 51, 51);cursor:default;font-family:sans-serif, Arial, Verdana, &quot;Trebuchet MS&quot;;font-size:13px;height:306px;line-height:20.8px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_pic3_0_01318ad59f.jpg\" alt=\"\" width=\"450\">\u003Cspan style=\"line-height:1.6em;\"> &nbsp; &nbsp; &nbsp;\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>&nbsp; &nbsp;&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cspan style=\"font-size:16px;\">\u003Cstrong>JGC Malaysia Safety Day 2016 on&nbsp;3 June&nbsp;2016 in Kuala Lumpur &nbsp;\u003C\u002Fstrong>\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_pic4_0_4e4e82c847.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_pic5_0_5369042647.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_img_4549_0_5849cdcf51.jpg\" alt=\"\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_20160603_091105_0_fbe0d86420.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafety_day_2016_20160603_092116_0_d8451cc31c.jpg\" alt=\"\" width=\"450\">\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>","jgc-safety-day-2016-tank-7-nj-paf-mdr-projects-bintulu-and-kuala-lumpur","2026-06-19T09:31:26.606Z","2026-06-19T09:31:26.611Z",{"id":406,"metaTitle":416,"metaDescription":410,"metaKeywords":16,"structuredData":16},"JGC Safety Day 2016 for Tank 7 NJ-PAF & MDR Projects in Bintulu and Kuala Lumpur | JGC Malaysia",{"id":4,"documentId":418,"title":419,"date":420,"description":421,"content":422,"externalLink":16,"slug":423,"createdAt":424,"updatedAt":424,"publishedAt":425,"image":16,"seo_settings":426},"ucu59tzrf62i4o4xq0mf4ye3","30 Million Man-hours without LTI","2015-12-18","On 3rd October 2015, JGC Malaysia clocked 30 Million Man-hours without LTI on the PETRONAS LNG Train 9 Project. This significant milestone was achieved by the collaborative efforts of approximately 6,000 active employees on the project.","\u003Cp>On 3rd October 2015, JGC Malaysia clocked 30 Million Man-hours without LTI on the PETRONAS LNG Train 9 Project. This significant milestone was achieved by the collaborative efforts of approximately 6,000 active employees on the project.\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">The achievement of 30 Million Man-hours without LTI is a clear indication that safety remains a value in Train 9 Project and further supports the notion that the project’s safety culture has gained maturity – made possible by JGC Malaysia’s relentless pursuit towards Incident and Injury Free (IIF) work environment.&nbsp; This achievement is also the result of a strong conviction that it is possible to construct a world class LNG facility without injury.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">A commemorative event to recognize and celebrate the achievement of 30 Million Man-hours without LTI was held on 28th November 2015. Whilst celebrating its achievement, the Project Management Team took the opportunity to remind the workforce to ‘keep their eyes on the ball’ – to look out for hazards that are inherent towards the finishing stage of the project.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">The project is currently campaigning on ‘finishing strong’ which means each and every employee completing the project safely, successfully and ‘going back home happily’ in line with JGC’s corporate motto, ‘Work Safely, Go Home Happily’.&nbsp; To ensure that the objective of the campaign is strongly imprinted into the hearts and minds of the workforce, a ‘Human Smiley’ was formed.&nbsp; The ‘smile’ was chosen as the motif for the campaign as this would be the expression on the face of the employees as they complete the project safely and successfully.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">‘Human Smiley’ – Work Safely and Go Home Happily\u003C\u002Fspan>\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">\u003Cimg style=\"height:500px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002F30_mil_mh_without_lti_pic_1_fdbfeae8ba.jpg\" alt=\"\" width=\"800\">\u003C\u002Fp>\u003Cp class=\"rtecenter\">\u003Cimg style=\"height:500px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Ftrain_9_project_30_million_mh_milestone_smiley_image_official_pic_2_c12c8fcd22.jpg\" alt=\"\" width=\"800\">\u003C\u002Fp>\u003Cp class=\"rtecenter\">\u003Cimg style=\"height:500px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002F30_mil_mh_without_lti_pic_3_9d17d75551.jpg\" alt=\"\" width=\"800\">\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;&nbsp;\u003C\u002Fp>","30-million-man-hours-without-lti","2026-06-19T09:31:26.401Z","2026-06-19T09:31:26.414Z",{"id":4,"metaTitle":427,"metaDescription":421,"metaKeywords":16,"structuredData":16},"30 Million Man-hours without LTI | JGC Malaysia",{"id":19,"documentId":429,"title":430,"date":431,"description":432,"content":433,"externalLink":16,"slug":434,"createdAt":435,"updatedAt":435,"publishedAt":436,"image":16,"seo_settings":437},"za3z0qaj5711z0mo8nmj3yji","JGC Malaysia honoured with NCOSH National Safety Award 2015","2015-12-09","Another proud moment for JGC Malaysia in winning the NCOSH NATIONAL SAFETY AWARD 2015.","\u003Cp>Another proud moment for JGC Malaysia in winning the NCOSH NATIONAL SAFETY AWARD 2015.\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">With implementation of Incident Injury Free (IIF) program by JGC and first of its kind in any PETRONAS Project, it has become an interest to DOSH to oversee the project being implemented safely and successfully.&nbsp; On 28 October 2015, JGC Malaysia received a letter from National Council for Occupational Safety and Health that JGC Malaysia and Train 9 Project had been selected and awarded as the recipient for the Excellence Occupational Safety and Health Award 2015 for Construction Category.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;\u003C\u002Fp>\u003Cp>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp;\u003Cimg style=\"height:580px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002F067_fda452df99.jpeg\" alt=\"\" width=\"850\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:auto;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fncosh_certificate_6ee6aac967.jpg\" alt=\"\" width=\"100%\"> &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:520px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsites\u002Fdefault\u002Ffiles\u002FNCOSH%20CERTIFICATE%202015-edited2.jpg\" alt=\"\" width=\"420\"> &nbsp; &nbsp; &nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cdiv>&nbsp;\u003C\u002Fdiv>\u003Cdiv>&nbsp;\u003C\u002Fdiv>\u003Cdiv>&nbsp;\u003C\u002Fdiv>","jgc-malaysia-honoured-ncosh-national-safety-award-2015","2026-06-19T09:31:26.493Z","2026-06-19T09:31:26.500Z",{"id":19,"metaTitle":438,"metaDescription":432,"metaKeywords":16,"structuredData":16},"JGC Malaysia honoured with NCOSH National Safety Award 2015 | JGC Malaysia",{"id":440,"documentId":441,"title":442,"date":443,"description":444,"content":445,"externalLink":16,"slug":446,"createdAt":447,"updatedAt":447,"publishedAt":448,"image":16,"seo_settings":449},30,"uwmgp872bxu0gtxqhdar0xfn","Petronas LNG Train 9 Project Safety Day Achievement – 20 Million Man Hours without Lost Time Injury (LTI)","2015-05-21","JGC Malaysia has on 14 May 2015, accomplished another significant milestone in terms of its stringent Safe Working Policy by achieving 20 million man hours without Lost Time Injury (LTI) under its Petronas LNG Train 9 Project, reflecting the company's commitment to ensuring that the safety of our workforce remains our highest priority.","\u003Cp>\u003Cspan style=\"line-height:1.6em;\">JGC Malaysia&nbsp;has on 14 May 2015, accomplished another significant milestone in terms of its stringent Safe Working Policy by achieving 20 million man hours without Lost Time Injury (LTI) under its Petronas LNG Train 9 Project, reflecting the company's commitment to ensuring that the safety of our workforce remains our highest priority.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">The company has consistently and will continue to demonstrate outstanding safety performance through its Safe Working Policy in all its operations and projects and will ensure safety will not be compromised in the completion of the project.&nbsp;\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cstrong>JGC Safety Day 2015 in Bintulu, Sarawak on 14 May 2015\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>1. &nbsp;Mass Tool Box Meeting (TBM)\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:270px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fmass_tbm_5_973ca89d12.jpeg\" alt=\"\" width=\"920\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fmass_tbm_1_0_90ddf4e725.jpeg\" alt=\"Mass TBM-1_0.JPG\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fmass_tbm_2_0_ffdef82842.jpeg\" alt=\"Mass TBM-2_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fmass_tbm_3_0_877baf5916.jpeg\" alt=\"Mass TBM-3_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>2. &nbsp;Smile Walkthrough\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsmile_2_0_a0133596d4.jpeg\" alt=\"Smile-2_0.JPG\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsmile_1_0_11ba85c56b.jpeg\" alt=\"Smile-1_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">3. &nbsp;Lunch with our VIPs - The Workforce\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">&nbsp;\u003C\u002Fspan>\u003Cimg style=\"height:306px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flunch_with_vip_1_0_1bed367446.jpeg\" alt=\"\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flunch_with_vip_3_0_0_b4c5721b8a.jpeg\" alt=\"Lunch with VIP-3_0_0.JPG\" width=\"450\">\u003Cspan style=\"line-height:1.6em;\"> &nbsp; &nbsp;&nbsp;\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flunch_with_vip_2_0_0_6580049e88.jpeg\" alt=\"Lunch with VIP-2_0_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">4. &nbsp;Safety Forum\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafetyforum_1_0_e6a582e7a4.jpeg\" alt=\"SafetyForum-1_0.JPG\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafetyforum_3_0_d3f5750468.jpeg\" alt=\"SafetyForum-3_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsafetyforum_2_0_7672e65099.jpeg\" alt=\"SafetyForum-2_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>5. &nbsp;Sponsor's Dinner on 13 May 2015\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:270px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdinner_6_1_ca1b3b9e4f.jpeg\" alt=\"Dinner-6_1.JPG\" width=\"920\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdinner_4_0_79c976346c.jpeg\" alt=\"Dinner-4_0.JPG\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdinner_1_0_d4ec87f445.jpeg\" alt=\"Dinner-1_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdinner_5_0_41a39452c6.jpeg\" alt=\"Dinner-5_0.JPG\" width=\"450\"> &nbsp; &nbsp;&nbsp;\u003Cimg style=\"height:306px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdinner_3_0_09e7311987.jpeg\" alt=\"Dinner-3_0.JPG\" width=\"450\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">&nbsp; &nbsp; &nbsp;\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>","petronas-lng-train-9-project-safety-day-achievement-20-million-man-hours-without-lost-time","2026-06-19T09:31:26.669Z","2026-06-19T09:31:26.676Z",{"id":440,"metaTitle":450,"metaDescription":444,"metaKeywords":16,"structuredData":16},"Petronas LNG Train 9 Project Safety Day Achievement – 20 Million Man Hours without Lost Time Injury (LTI) | JGC Malaysia",{"id":83,"documentId":452,"title":453,"date":454,"description":455,"content":456,"externalLink":16,"slug":457,"createdAt":458,"updatedAt":458,"publishedAt":459,"image":16,"seo_settings":460},"j0eaykolfi2ageyg5mbhajdw","JGC Malaysia Received Certificate of Appreciation Award from DOSH Sarawak","2015-05-20","Bintulu – JGC Malaysia has been awarded with the “Certificate of Appreciation” by the Department of Occupational Safety and Health (DOSH) Sarawak on   13 May 2015 for our involvement in the implementation of DOSH Mentor-Mentee Program. The program started in first quarter of 2014 and completed in March 2015 for a duration of one (1) year.","\u003Cp class=\"rtejustify\">\u003Cstrong>Bintulu\u003C\u002Fstrong> – JGC Malaysia has been awarded with the “Certificate of Appreciation” by the Department of Occupational Safety and Health (DOSH) Sarawak on &nbsp; 13 May 2015 for our involvement in the implementation of DOSH Mentor-Mentee Program. The program started in first quarter of 2014 and completed in March 2015 for a duration of one (1) year.\u003C\u002Fp>\u003Cp class=\"rtejustify\">\u003Cspan style=\"line-height:1.6em;\">JGC Malaysia (Mentor) served as a guide to Naim Engineering (Mentee) on the effective implementation and managing occupational safety health at the project construction site.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp class=\"rtejustify\">&nbsp;\u003C\u002Fp>\u003Cp class=\"rtejustify\">\u003Cimg style=\"height:290px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdosh_1_2a6678fe62.jpg\" alt=\"\" width=\"465\">\u003Cspan style=\"line-height:1.6em;\"> &nbsp; &nbsp;\u003C\u002Fspan>\u003Cimg style=\"height:290px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fdosh_2_147d434cae.jpg\" alt=\"\" width=\"465\">\u003Cspan style=\"line-height:1.6em;\"> &nbsp;\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>&nbsp; &nbsp;\u003Cspan style=\"line-height:1.6em;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;\u003C\u002Fspan>\u003Cimg style=\"height:600px;line-height:1.6em;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fcertificate_of_appreciation_dosh_1_32769d3d57.jpg\" alt=\"Certificate of Appreciation-DOSH_1.jpg\" width=\"460\">\u003C\u002Fp>","jgc-malaysia-received-certificate-appreciation-award-dosh-sarawak","2026-06-19T09:31:26.533Z","2026-06-19T09:31:26.541Z",{"id":83,"metaTitle":461,"metaDescription":455,"metaKeywords":16,"structuredData":16},"JGC Malaysia Received Certificate of Appreciation Award from DOSH Sarawak | JGC Malaysia",{"id":463,"documentId":464,"title":465,"date":466,"description":467,"content":468,"externalLink":16,"slug":469,"createdAt":470,"updatedAt":470,"publishedAt":471,"image":16,"seo_settings":472},26,"mrlh5pbj5bul76trbh544hc8","The Launching of The Oil and Gas Year Malaysia 2015","2015-04-27","Kuala Lumpur – The Oil & Gas Year (TOGY) Malaysia 2015 was launched at the Shangri-La Hotel, Kuala Lumpur today.","\u003Cp>\u003Cstrong>Kuala Lumpur\u003C\u002Fstrong> – The Oil &amp; Gas Year (TOGY) Malaysia 2015 was launched at the Shangri-La Hotel, Kuala Lumpur today.\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">In this event, JGC Malaysia was presented with the “Engineering and Construction Project of the Year” award for its Petronas LNG Train 9 Project in Bintulu, Sarawak. Accepting the award on behalf of the company is the Managing Director, Mr Takahiro Kobori. During his speech, he thanked TOGY for the award received in recognition of the company’s skills and efforts. He stressed the importance of safety which has been and will always be the company’s top priority in which saw the company achieving more than 20 Million Man Hours without Lost Time Injury (LTI). He also said that JGC Malaysia is committed and will continue to make its priority in ensuring that safety will not be compromised while completing the projects.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">Meanwhile, the following companies were also recognised for their achievements:-\u003C\u002Fspan>\u003C\u002Fp>\u003Cul>\u003Cli>&nbsp;&nbsp;Man of the Year – Dialog Group\u003C\u002Fli>\u003Cli>&nbsp;&nbsp;Upstream Project of the Year – ExxonMobil\u003C\u002Fli>\u003Cli>&nbsp;&nbsp;New Exploration and Production Entrant of the Year – SapuraKencana Petroleum\u003C\u002Fli>\u003Cli>&nbsp;&nbsp;Local Oilfield Services Company of the Year – Deleum\u003C\u002Fli>\u003Cli>&nbsp;&nbsp;Initial Public Offering of the Year – Icon Offshore\u003C\u002Fli>\u003C\u002Ful>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">\u003Cimg style=\"height:394px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Ftogy_award_ec_project_of_the_year_dd_27_apr_2015_pic2_0_1f599b4c44.jpg\" alt=\"TO&amp;GY award-E&amp;C Project of the Year dd 27 Apr 2015-pic3.png\" width=\"591\">\u003C\u002Fp>\u003Cp>\u003Cem>\u003Cstrong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Mr Kobori posing for a photo session with TOGY’s COO, Ms Asli Konyali and Regional Director, Mr Eric Gay after &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;receiving the prestigious award.&nbsp;\u003C\u002Fstrong>\u003C\u002Fem>\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;\u003Cspan style=\"font-size:14px;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;\u003C\u002Fspan>\u003C\u002Fp>","launching-oil-and-gas-year-malaysia-2015","2026-06-19T09:31:26.636Z","2026-06-19T09:31:26.643Z",{"id":463,"metaTitle":473,"metaDescription":467,"metaKeywords":16,"structuredData":16},"The Launching of The Oil and Gas Year Malaysia 2015 | JGC Malaysia",{"id":93,"documentId":475,"title":476,"date":477,"description":478,"content":479,"externalLink":16,"slug":480,"createdAt":481,"updatedAt":481,"publishedAt":482,"image":16,"seo_settings":483},"r6iw54ga80i37ugnidd0sq8f","JGC Malaysia Wins EPCC Contract for LNG Complex Expansion Project ","2015-01-27","Kuala Lumpur – JGC Malaysia announced today that, as a member of a consortium with JGC Corporation, it has been awarded a contract by PETRONAS LNG 9 Sdn. Bhd (PL9SB), a wholly-owned subsidiary of PETRONAS. This engineering, procurement, construction and commissioning (EPCC) contract award is part of the expansion of the PETRONAS’ LNG Complex (PLC) in Bintulu, Sarawak, Malaysia. The contract, valued at approximately 60 billion yen, calls for the EPCC work associated with expansion of LNG storage and shipping facilities at the PLC.","\u003Cp>\u003Cstrong>Kuala Lumpur\u003C\u002Fstrong>&nbsp;– JGC Malaysia announced today that, as a member of a consortium with JGC Corporation, it has been awarded a contract by PETRONAS LNG 9 Sdn. Bhd (PL9SB), a wholly-owned subsidiary of PETRONAS. This engineering, procurement, construction and commissioning (EPCC) contract award is part of the expansion of the PETRONAS’ LNG Complex (PLC) in Bintulu, Sarawak, Malaysia. The contract, valued at approximately 60 billion yen, calls for the EPCC work associated with expansion of LNG storage and shipping facilities at the PLC. The PLC is one of the world’s largest LNG production facilities and currently has eight production trains with a combined capacity of 25.7 million tonnes per annum (MPTA).\u003C\u002Fp>\u003Cp>\u003Cspan style=\"line-height:1.6em;\">The contract received by JGC Malaysia calls for EPCC work associated with construction of the piping and associated facilities connecting the existing six LNG storage tanks and the seventh new LNG storage tank with the shipping facilities. This includes the piping connecting the LNG rundown lines from the existing LNG trains with the LNG rundown line from the ninth LNG train currently under construction.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>JGC Malaysia has constructed all existing eight trains at PLC since the 1980’s, and is currently executing the EPCC work on the ninth train. Since the completion of the first LNG train at PLC, JGC Malaysia has also continued to work on rejuvenation, expansion and revamping projects at the PLC.\u003C\u002Fp>\u003Cp>This project will help stabilize Malaysia’s capacity to export LNG which will in turn help to support the country’s continuing economic growth. The project will also be important in helping Japan’s energy security, as they currently rely on Malaysia for more than 15% of its total LNG imports.\u003C\u002Fp>\u003Cp>JGC Malaysia is committed in ensuring the success of this project and the other projects that we are currently conducting at PLC, including the construction of the ninth LNG train, as well as rejuvenation of the fourth, fifth and sixth LNG trains.\u003C\u002Fp>\u003Cp>As a group, JGC has been responsible for the construction of LNG plants worldwide accounting for about one third of the global LNG production capacity. Demand for expansion and renovation projects in live operating plants is expected to grow worldwide. In the field of such projects, even higher level of construction safety management is required as the key for successful project completion. As a top contractor in Health, Safety and Environment (HSE), as well in the field of LNG plants, JGC Malaysia will continue to firmly develop its business activities in the field of expansion and renovation projects in live operating plants.\u003C\u002Fp>","jgc-malaysia-wins-epcc-contract-lng-complex-expansion-project","2026-06-19T09:31:26.553Z","2026-06-19T09:31:26.562Z",{"id":93,"metaTitle":484,"metaDescription":478,"metaKeywords":16,"structuredData":16},"JGC Malaysia Wins EPCC Contract for LNG Complex Expansion Project | JGC Malaysia",{"id":486,"documentId":487,"title":488,"date":489,"description":490,"content":491,"externalLink":16,"slug":492,"createdAt":493,"updatedAt":493,"publishedAt":494,"image":16,"seo_settings":495},28,"a4oyxgqo7v0gsohk95ebwcvf","Petronas LNG Train 9 Project Achievement – 5 Million Man Hours Without Lost Time Injury (LTI)","2014-07-01","JGC Malaysia is pleased to announce that Petronas LNG Train 9 Project has achieved 5 million man hours without Lost Time Injury (LTI) on 14 June 2014. This cumulative man hours consist of works done at construction sites in Bintulu, Sarawak and Dialog Piping Fabrication Shop in Banting, Selangor.To commemorate this milestone, the project has conducted Safety Day 2014 on 19 June 2014 at the LNG Train 9 construction site and on 27 June 2014 at Dialog Piping Fabrication Shop to achieve the following objectives:","\u003Cp>JGC Malaysia is pleased to announce that Petronas LNG Train 9 Project has achieved 5 million man hours without Lost Time Injury (LTI) on 14 June 2014. This cumulative man hours consist of works done at construction sites in Bintulu, Sarawak and Dialog Piping Fabrication Shop in Banting, Selangor.\u003C\u002Fp>\u003Cp>To commemorate this milestone, the project has conducted Safety Day 2014 on 19 June 2014 at the LNG Train 9 construction site and on 27 June 2014 at Dialog Piping Fabrication Shop to achieve the following objectives:\u003C\u002Fp>\u003Cul>\u003Cli>To implement campaign ‘WORK SAFELY, GO HOME HAPPILY’,\u003C\u002Fli>\u003Cli>To demonstrate Management Commitment towards an Incident and Injury Free (IIF) in Train 9 Project,\u003C\u002Fli>\u003Cli>To instil an ‘actively caring’ culture amongst the workforce,\u003C\u002Fli>\u003Cli>To recognize the efforts of the Workforce in regards to working safely till date and\u003C\u002Fli>\u003Cli>To continue motivating the Workforce in working safely and to gain their commitment in maintaining a work environment that is truly ‘Incident and Injury Free’.\u003C\u002Fli>\u003C\u002Ful>\u003Ch3>\u003Cstrong>JGC Safety Day 2014 in Bintulu, Sarawak on 19 June 2014\u003C\u002Fstrong>\u003C\u002Fh3>\u003Cdiv class=\"col-md-6\">\u003Cdiv class=\"corporate-block\">\u003Cp>1. Mass Tool Box Meeting (TBM)\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti1_3dd201cdca.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti2_a8bd8bca35.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti3_0196872617.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>\u003Cdiv class=\"col-md-6 \">\u003Cdiv class=\"corporate-block\">\u003Cp>2. Incident &amp; Injury Free (IIF) Smile Walkthrough\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti4_c028ff88ef.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti5_badf6b7c25.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti6_19dc1666e1.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>\u003Cdiv class=\"col-md-6\">\u003Cdiv class=\"corporate-block\">\u003Cp>3. General Workers Lunch with Senior Management\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti7_0ead3e2dbd.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti8_7260316380.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti9_bc2da21d50.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>\u003Cdiv class=\"col-md-6 \">\u003Cdiv class=\"corporate-block\">\u003Cp>4. Incident &amp; Injury Free (IIF) Forum\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti10_778c9c6dec.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti11_0f624691da.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti12_8b83cf1b74.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>\u003Ch3 style=\"margin-top:25px;\">&nbsp;\u003C\u002Fh3>\u003Ch3 style=\"margin-top:25px;\">\u003Cstrong>JGC Safety Day 2014 in Banting, Selangor on 27 June 2014\u003C\u002Fstrong>\u003C\u002Fh3>\u003Cdiv class=\"col-md-6\">\u003Cdiv class=\"corporate-block\">\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti15_767cf896f2.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti18_0b97dc3e90.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti13_46858a0d5a.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>\u003Cdiv class=\"col-md-6\">\u003Cdiv class=\"corporate-block\">\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti16_d13c1cf32d.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti19_560b649c3c.jpg\" alt=\"\">\u003C\u002Fp>\u003Cp>\u003Cimg class=\"img-responsive\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Flti14_7f45b07470.jpg\" alt=\"\">\u003C\u002Fp>\u003C\u002Fdiv>\u003C\u002Fdiv>","petronas-lng-train-9-project-achievement-5-million-man-hours-without-lost-time-injury-lti","2026-06-19T09:31:26.652Z","2026-06-19T09:31:26.659Z",{"id":486,"metaTitle":496,"metaDescription":490,"metaKeywords":16,"structuredData":16},"Petronas LNG Train 9 Project Achievement – 5 Million Man Hours Without Lost Time Injury (LTI) | JGC Malaysia",{"id":29,"documentId":498,"title":499,"date":500,"description":501,"content":502,"externalLink":16,"slug":503,"createdAt":504,"updatedAt":504,"publishedAt":505,"image":16,"seo_settings":506},"gsnrz46ioqruke7xo02248rx","JGC Malaysia pays courtesy visit to Sarawak Chief Minister","2014-03-21","A six-member delegation from JGC Corporation (JGC) and JGC Malaysia (JMSB) led by Mr.Koichi Kawana, president and representative director of JGC Corporation, paid a courtesy visit recently to the newly appointed Sarawak Chief Minister Tan Sri Datuk Amar Adenan Satem to brief and provide him an overview of JGC Group's business operations and its current business activities in Sarawak for the past 35 years.  ","\u003Cp>A six-member delegation from JGC Corporation (JGC) and JGC Malaysia (JMSB) led by Mr.Koichi Kawana, president and representative director of JGC Corporation, paid a courtesy visit recently to the newly&nbsp;appointed Sarawak Chief Minister Tan Sri Datuk Amar Adenan Satem to brief and provide him an overview of JGC Group's business operations and its current business activities in Sarawak for the past 35&nbsp;years.&nbsp;\u003Cbr>&nbsp;\u003Cbr>JGC and JMSB have been involved in the construction of MLNG's liquefied natural gas (LNG) plants as well as the construction of Shell Malaysia's Shell Middle Distillate Synthesis's (SMDS) gas-to-liquid (GTL)&nbsp;plant in Bintulu, Sarawak. Currently, both companies are working on Petroliam Nasional Bhd (Petronas) Train 9 project on the construction of the 9th train to the existing Petronas LNG Complex in Bintulu.\u003C\u002Fp>\u003Cp>\u003Cimg style=\"height:648px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fjgc_news_3997521749.png\" alt=\"jgc_news.png\" width=\"725\">\u003C\u002Fp>","jgc-malaysia-pays-courtesy-visit-sarawak-chief-minister","2026-06-19T09:31:26.513Z","2026-06-19T09:31:26.522Z",{"id":29,"metaTitle":507,"metaDescription":501,"metaKeywords":16,"structuredData":16},"JGC Malaysia pays courtesy visit to Sarawak Chief Minister | JGC Malaysia",{"id":509,"documentId":510,"title":511,"date":512,"description":513,"content":514,"externalLink":16,"slug":515,"createdAt":516,"updatedAt":516,"publishedAt":517,"image":16,"seo_settings":518},20,"f2uzszbimjfz9jn4837h0msu","JGC Malaysia Wins LNG Plant Rejuvenation Project in Malaysia","2014-03-05","Kuala Lumpur, Malaysia – JGC Malaysia announced today that, as a member of a consortium with JGC Corporation and Malaysian company Synerlitz, it has won a contract from Malaysia LNG Dua Sdn. Bhd. for rejuvenation work on an LNG plant in Bintulu, Sarawak, Malaysia.","\u003Cp>Kuala Lumpur, Malaysia – JGC Malaysia announced today that, as a member of a consortium with JGC Corporation and Malaysian company Synerlitz, it has won a contract from Malaysia LNG Dua Sdn. Bhd. for rejuvenation work on an LNG plant in Bintulu, Sarawak, Malaysia.\u003C\u002Fp>\u003Cp>The client is a joint venture between the Malaysian state-owned oil company Petroleum Nasional Berhad (PETRONAS) (60%), Shell (15%), Mitsubishi Corporation (15%), and the Sarawak state government (10%). The lump-sum turnkey contract calls for the engineering, procurement, construction and commissioning (EPCC) work associated with the rejuvenation of an LNG plant located in Bintulu in the state of Sarawak. The EPCC Contract value was not disclosed, and work is scheduled for completion in January of 2019.\u003C\u002Fp>\u003Cp>The purpose of this project is the rejuvenation of the 4th, 5th, and 6th LNG trains at the PETRONAS LNG Complex in Bintulu, which is one of the largest LNG production complex in the world (the existing eight trains are currently in operation, while a 9th train is currently under construction by JGC Malaysia.) JGC Group was awarded the front end engineering and design (FEED) work for the replacement of the main cryogenic heat exchanger for Train 4 in 2012. Last year, JGC Group received a competitive tender for EPCC, and now, as part of a consortium, has been awarded the EPCC work for rejuvenation of Train 4, as well as engineering and a portion of the procurement work associated with the rejuvenation of Train 5 and Train 6.\u003C\u002Fp>\u003Cp>JGC Group has a strong record not only in plant construction, but also in plant maintenance, expansion, and renovation—\"life cycle support\" that addresses the needs of clients on a permanent basis. Over the past 30 years, starting in the 1980's, JGC Group has performed the EPCC work for the existing eight trains of the Bintulu LNG Complex, and is currently working on the 9th train. As part of \"life cycle support,\" JGC Group has continued to work on rejuvenation, expansion, and revamp projects at the plant. JGC Group's previous contributions to PETRONAS group, detailed knowledge of the Bintulu LNG Complex, and high level of LNG engineering technology are believed to all have been important factors in the client's decision to award this new rejuvenation contract to JGC Group.\u003C\u002Fp>\u003Cp>JGC Group has been responsible for the construction of LNG plants worldwide accounting for about 30% of the global LNG production capacity, and is currently involved in eight LNG construction projects in Malaysia, Australia, Indonesia, Papua New Guinea, Russia, and Canada. Demand for rejuvenation, expansion, and revamp of LNG plants is expected to rise worldwide. Through its continued involvement in such projects, JGC will reaffirm its position as a top contractor in the field of LNG plants.\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003Cimg style=\"height:740px;\" src=\"https:\u002F\u002Fjgc.assetz.my\u002Fsites\u002Fdefault\u002Ffiles\u002FNST%20Biz%20News-Bintulu%20LNG%20Deal-v1.jpg\" alt=\"NST Biz News-Bintulu LNG Deal-v1.jpg\" width=\"765\">\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp>&nbsp;\u003C\u002Fp>\u003Cp class=\"rtecenter\">&nbsp;\u003C\u002Fp>","jgc-malaysia-wins-lng-plant-rejuvenation-project-malaysia","2026-06-19T09:31:26.591Z","2026-06-19T09:31:26.597Z",{"id":509,"metaTitle":519,"metaDescription":513,"metaKeywords":16,"structuredData":16},"JGC Malaysia Wins LNG Plant Rejuvenation Project in Malaysia | JGC Malaysia",{"id":43,"documentId":521,"title":522,"date":523,"description":524,"content":525,"externalLink":16,"slug":526,"createdAt":527,"updatedAt":527,"publishedAt":528,"image":16,"seo_settings":529},"o0nsa56efgb312kypewz6p1x","JGC Malaysia Awarded Contract for Floating LNG Plant in Malaysia","2014-02-14","Kuala Lumpur, Malaysia – JGC Malaysia announced today that, as a member of a consortium with JGC Corporation and Samsung Heavy Industries Co. Ltd., it has received a contract from Petroliam Nasional Berhad (PETRONAS), the Malaysian state-owned oil company, to construct a floating LNG plant on gas fields off the Malaysian coast. The lump-sum turnkey contract calls for the engineering, procurement, construction, installation and commissioning (EPCIC) work for a floating LNG plant with a production capacity of 1.5 million tons per year of LNG, scheduled for completion in 2018.","\u003Cp>Kuala Lumpur, Malaysia – JGC Malaysia announced today that, as a member of a consortium with JGC Corporation and Samsung Heavy Industries Co. Ltd., it has received a contract from Petroliam Nasional Berhad (PETRONAS), the Malaysian state-owned oil company, to construct a floating LNG plant on gas fields off the Malaysian coast. The lump-sum turnkey contract calls for the engineering, procurement, construction, installation and commissioning (EPCIC) work for a floating LNG plant with a production capacity of 1.5 million tons per year of LNG, scheduled for completion in 2018.\u003C\u002Fp>\u003Cp>This project will be the second floating LNG plant to be constructed for the Malaysian offshore gas fields. The main responsibility of JGC Group will be the engineering and procurement of the LNG facilities, while Samsung Heavy Industries in South Korea will construct the hull as well as the modular facilities.\u003C\u002Fp>\u003Cp>In 2012, PETRONAS awarded the FEED (front end engineering and design) contract for this project to two separate consortia under a dual FEED scheme, with both groups bidding competitively for the EPCIC portion of the project on the strength of their FEED work. The EPCIC contract was awarded to the JGC-led consortium.\u003C\u002Fp>\u003Cp>This project will be the third commercial floating LNG plant to achieve Final Investment Decision (FID) in the world. It is the first floating LNG plant located over gas fields more than 1,000 meters beneath the ocean's surface, and as such is a ground-breaking project for the global offshore oil and gas industry.\u003C\u002Fp>\u003Cp>It is believed that the consortium was selected on the basis of JGC Group's superior project execution capabilities for the floating LNG field, as well as Samsung's high level of shipbuilding technology, backed by JGC Group's project management know-how and the strong leadership we demonstrated during the FEED stage.\u003C\u002Fp>\u003Cp>Over the past 30 years, starting from the 1980's, JGC Group has performed numerous EPCC projects for PETRONAS, and built up a strong trust relationship with the company. JGC Group is looking forward to the successful completion of this project. Together with the PETRONAS LNG Train 9 Project awarded last year, we aim to live up to the client's high expectations and further deepen our relationship of trust by the smooth execution of the work.\u003C\u002Fp>\u003Cp>Currently, numerous plans are progressing around the globe for constructing floating LNG plants for mid- to small-scale offshore gas fields where extraction of resources had not been deemed economically feasible. To date, JGC Group has been responsible for the construction of about 30% of LNG plants worldwide, and is currently executing seven (7) new LNG plant projects in Malaysia, Australia, Indonesia, Papua New Guinea, Russia, and Canada.\u003C\u002Fp>\u003Cp>Branching out into offshore fields is one of the main tenets of our medium-term management plan, \"New Horizon 2015,\" and as a part of this initiative we are nearing completion of the FEED work for another floating LNG plant in Asia, as well as investing in a shipbuilding company in Brazil. This new contract marks a major step toward greater involvement in the offshore sector, and is epoch-making in the history of JGC Group. Going forward, JGC Group aims to become a top offshore contractor focusing on the field of floating LNG plants and will be exerting efforts to achieve this goal.\u003C\u002Fp>","jgc-malaysia-awarded-contract-floating-lng-plant-malaysia","2026-06-19T09:31:26.471Z","2026-06-19T09:31:26.476Z",{"id":43,"metaTitle":530,"metaDescription":524,"metaKeywords":16,"structuredData":16},"JGC Malaysia Awarded Contract for Floating LNG Plant in Malaysia | JGC Malaysia",{"id":56,"documentId":532,"title":533,"date":534,"description":535,"content":536,"externalLink":16,"slug":537,"createdAt":538,"updatedAt":538,"publishedAt":539,"image":16,"seo_settings":540},"jk7vxmkre2o0te7rumyte7gq","JGC Malaysia Wins EPCC Contract for the PETRONAS LNG Train 9 Project","2013-03-14","JGC Malaysia Sdn. Bhd. is awarded Train 9 together with JGC Corp","\u003Cp>Kuala Lumpur, Malaysia - JGC Malaysia announced today that jointly with its parent company, JGC Corporation, it has been awarded a contract by PETRONAS LNG 9 Sdn. Bhd., a wholly-owned subsidiary of PETRONAS for the Engineering, Procurement, Construction and Commissioning (EPCC) work for the construction of the 9th LNG Train and its associated facilities in the PETRONAS LNG Complex in Bintulu, Sarawak, Malaysia.\u003C\u002Fp>\u003Cp>The EPCC Contract is valued close to USD 2.0 Billion, and work is for completion at the end of 2015.\u003C\u002Fp>\u003Cp>Over the past 30 years, JGC Group has performed the Engineering, Procurement, Construction and Commissioning for the existing eight (8) trains at the LNG Complex, and has executed Rejuvenation projects to increase the plant's production capacity. This additional train, Train 9, will have a capacity of approximately 3.6 million tons of LNG per year and its feedstock will be supplied from PETRONAS' newly developed offshore gas fields, off the coast of Sarawak, Malaysia.\u003C\u002Fp>\u003Cp>In January 2012, two groups including JGC Corporation, were awarded the contract to take part in a design competition for the Front-End Engineering Design (FEED) and EPCC Early Works for this project. Both FEED packages were then put through a rigorous technical and commercial evaluation to select the winning Contractor, leading to the award of the EPCC Contract.\u003C\u002Fp>\u003Cp>By achieving a smooth transition from the FEED phase to the EPCC phase, as well as efficient project execution made possible by its accumulated know-how and expertise, JGC Malaysia is looking forward to the successful completion of the project which will help further the relationship and trust that has been established with the client.\u003C\u002Fp>\u003Cp>JGC Group has been responsible for the construction of LNG plants worldwide accounting for about 30% of the global LNG production capacity, and is currently involved in four LNG EPC projects in Australia, Indonesia, and Papua New Guinea, two FEED projects for floating LNG plants in Malaysia and Indonesia, and FEED work for an onshore LNG plant in Mozambique. Through its continued involvement in such projects, JGC Group will reaffirm its position as a top contractor in the field of LNG plants.\u003C\u002Fp>","jgc-malaysia-wins-epcc-contract-petronas-lng-train-9-project","2026-06-19T09:31:26.572Z","2026-06-19T09:31:26.579Z",{"id":56,"metaTitle":541,"metaDescription":535,"metaKeywords":16,"structuredData":16},"JGC Malaysia Wins EPCC Contract for the PETRONAS LNG Train 9 Project | JGC Malaysia",1783659688819]